按Enter到主內容區
:::

國立臺北科技大學 學術資源網

:::

應國卿教授Ying, Kuo-Ching

現職:
臺北科大/工業工程與管理系
聯絡方式:

期刊論文

  • "Tailored iterated greedy metaheuristic for a scheduling problem in 3D printing", Advances in Engineering Software, 186, 1-12, 2023/12, SCI
  • "Reinforcement learning iterated greedy algorithm for distributed assembly permutation flowshop scheduling problems", Journal of Ambient Intelligence and Humanized Computing, 14, 11123-11138, 2023/08, SCI
  • "Meta-Lamarckian-based iterated greedy for optimizing distributed two-stage assembly flowshops with mixed-setups", Annals of Operations Research, 322, 125-246, 2023/03, SCI
  • "Minimizing makespan in two-stage assembly additive manufacturing: a reinforcement learning iterated greedy algorithm", Applied Soft Computing, 138, 110192, 2023/03, SCI
  • "Supply chain-oriented permutation flowshop scheduling considering flexible assembly and setup times", International Journal of Production Research, 61, 1, 258-281, 2023/01, SCI
  • "Reinforcement learning iterated greedy algorithm for distributed assembly permutation flowshop scheduling problems", Ambient Intelligence and Humanized Computing, 2022, 04392, 1-16, 2022/09, SCI
  • "Adjusted Iterative Greedy for the Optimization of Additive Manufacturing Scheduling Problems", Expert Systems with Applications, 198, 116908, 1-9, 2022/07, SCI
  • "Artificial intelligence in the Construction Industry: Main Development Trajectories and Future Outlook", Applied Sciences, 12, 5832, 1-19, 2022/06, SCI
  • "Single machine scheduling problems with sequence-dependent setup times and precedence delays", Scientific Reports, 12, 9430, 1-12, 2022/06, SCI
  • "Minimizing total completion time in no-wait jobshops using a backtracking multi-start simulated annealing algorithm", Computers & Industrial Engineering, 169, 108238, 1-12, 2022/05, SCI
  • "Meta-Lamarckian-based Iterated Greedy for Optimizing Distributed Two-stage Assembly Flowshops with Mixed-Setups", Annals of Operations Research, 2022, 045372, 1-22, 2022/02, SCI
  • "New benchmark algorithm for hybrid flowshop scheduling with identical machines", Expert Systems with Applications, 183, No. 115422, 2021/11, SCI
  • "Supply chain-oriented two-stage assembly flowshops with sequence-dependent setup times", Journal of Manufacturing Systems, 61, 139-154, 2021/10, SCI
  • "Deep learning-based optimization for motion planning of dual-arm assembly robots corresponding", Computers & Industrial Engineering, 160, No. 107603, 2021/08, SCI
  • "An auction bidding approach to balance performance bonuses in vehicle routing problems with time windows", Sustainability, 13, No. 9430, 2021/08, SCI
  • "New benchmark algorithms for no-wait flowshop group scheduling problem with sequence-dependent setup times", Applied Soft Computing, 111, No. 107705, 2021/07, SCI
  • "Minimizing makespan in job-shops with deterministic machine availability constraints", International Journal of Production Research, 59, 14, 4403-4415, 2021/07, SCI
  • "No-idle Flowshop Scheduling for Energy-Efficient Production: An Improved Optimization Framework", Mathematics, 9, 1335, 2021/06, SCI
  • "Unsupervised Learning-based Artificial Bee Colony for Minimizing Non-value-adding Operations", Applied Soft Computing, 105, No. 107280, 2021/03, SCI
  • "Multiple temperature simulated annealing for optimizing mixed-blocking permutation flowshop scheduling problems", Expert Systems with Applications, 165, No.113837, 2021/03, SCI
  • "New benchmark algorithm for minimizing total completion time in blocking flowshops with sequence-dependent setup times", Applied Soft Computing, 104, No. 107229, 2021/03, SCI
  • "Cyber-physical assembly system-based optimization for robotic assembly sequence plannings", Journal of Manufacturing Systems, 58, 452-466, 2021/02, SCI
  • "Maximizing cohesion and separation for detecting protein functional modules in protein-protein interaction networks", PLoS ONE, 15, 10, e0240628, 2020/10, SCI
  • "Solving no-wait job-shop scheduling problems using a multi-start simulated annealing with bi-directional shift timetabling algorithm", Computers & Industrial Engineering, 146, 8, 106615, 2020/08, SCI
  • "Minimizing total completion time in mixed blocking permutation flowshops", IEEE Access, 8, 1, 142065–142075, 2020/08, SCI
  • "Greedy-based Non-dominated Sorting Genetic Algorithm III for Optimizing Single-machine Scheduling Problem with Interfering Jobs", IEEE Access, 8, 1, 142543–142556, 2020/08, SCI
  • "Improved beam search for optimizing no-wait flowshops with release times", IEEE Access, 8, 1, 148100–148124, 2020/08, SCI
  • "Learning-based metaheuristic for scheduling unrelated parallel machines with uncertain setup times", IEEE Access, 8, 1, 74065–74082, 2020/05, SCI
  • "The appropriateness of machines to products by production efficiency view: A case study in the forging industry", Journal of Innovation and Business Management, 8, 1, 45-60, 2019/11, ELSE1
  • "Single machine job sequencing with a restricted common due window", IEEE Access, 7, 1, 148741-148755, 2019/10, SCI
  • "Comparative analysis of mixed integer programming formulations for single-machine and parallel-machine scheduling problems", IEEE Access, 7, 1, 152998-153011, 2019/10, SCI
  • "Scheduling jobs of two competing agents on a single machine", IEEE Access, 7, 1, 98702-98714, 2019/07, SCI
  • "Intelligent parametric design for a multiple-quality-characteristic glue-dispensing process", Journal of Intelligent Manufacturing, 30, 5, 2291-2305, 2019/06, SCI
  • "Minimizing makespan in mixed no-wait flowshops with sequence-dependent setup times", Computers & Industrial Engineering, 130, 1, 338-347, 2019/02, SCI
  • "Makespan optimization in a no-wait flowline manufacturing cell with sequence-dependent family setup times", Computers & Industrial Engineering, 128, 1, 1-7, 2019/02, SCI
  • "Solving the mask data preparation scheduling problem using meta-heuristics", IEEE Access, 7, 1, 24192-24203, 2019/02, SCI
  • "Minimizing makespan in distributed mixed no-idle flowshops", International Journal of Production Research, 57, 1, 48-60, 2019/01, SCI
  • "Minimizing the sum of makespan and total weighted tardiness in a no-wait flowshop", IEEE Access, 6, 1, 78666-78677, 2018/12, SCI
  • "Improved exact methods for solving no-wait flowshop scheduling problems with due date constraints", IEEE Access, 6, 1, 30702-30713, 2018/05, SCI
  • "Minimizing makespan for no-wait flowshop scheduling problems with setup times", Computers & Industrial Engineering, 121, 5, 73-81, 2018/05, SCI
  • "Optimization algorithms for proportionate flowshop scheduling problems with variable maintenance activities", Computers & Industrial Engineering, 117, 3, 164-170, 2018/03, SCI
  • "Decreasing the system testing makespan in a computer manufacturing company,", IEEE Access, 6, 1, 16464-16473, 2018/03, SCI
  • "Minimizing makespan for the distributed hybrid flowshop scheduling problem with multiprocessor tasks", Expert Systems with Applications, 92, 1, 132-141, 2018/02, SCI
  • "Combining Discrete Event and Agent-Based Simulation for Reducing Draftees' Waiting Time in Physical Examination Centers", International Journal of Industrial Engineering: Theory, Applications And Practice, 25, 2, 175-185, 2018/02, SCI
  • "Minimizing makespan in distributed blocking flowshops using hybrid iterated greedy algorithms", IEEE Access, 5, August, 15694-15705, 2017/12, SCI
  • "Optimal Allocation of Cashiers and Pharmacists in Large Hospitals: A Point-wise Fluid-based Dynamic Queueing Network Approach", IEEE Access, 6, December, 2859-2870, 2017/12, SCI
  • "An advanced iterated greedy algorithm for minimizing makespan in blocking flowshops", SYLWAN, 161, 8, 91-104, 2017/11, SCI
  • "Applying strain gauges to measuring thermal warpage of printed circuit boards", Measurement, 110, 2, 239-248, 2017/10, SCI
  • "Uniform parallel-machine scheduling for minimizing total resource consumption with a bounded makespan", IEEE Access, 5, August, 15791-15799, 2017/10, SCI
  • "Iterated reference greedy algorithm for solving distributed no-idle permutation flowshop scheduling problems", Computers & Industrial Engineering, 110, 2, 413-423, 2017/09, SCI
  • "Single-machine scheduling with learning effects and maintenance: a methodological note on some polynomial-time solvable cases", Mathematical Problems in Engineering, 2017, 1-6, 2017/09, SCI
  • "Minimizing total cost for training and assigning multi-skilled workers in seru production systems", International Journal of Production Research, 55, 10, 2978-2989, 2017/06, SCI
  • "Effective dynamic dispatching rule and constructive heuristic for solving single-machine scheduling problems with a common due window", International Journal of Production Research, 55, 6, 1707-1719, 2017/03, SCI
  • "Self-adaptive ruin-and-recreate algorithm for minimizing total flow time in no-wait flowshops", Computers & Industrial Engineering, 101, 1, 167-176, 2016/08, SCI
  • "Minimizing total weighted earliness and tardiness penalties on identical parallel machines using a fast ruin-and-recreate algorithm", International Journal of Production Research, 54, 22, 6879-6890, 2016/06, SCI
  • "Dynamic parametric design and feasibility assessment for a high resistance measuring system", Measurement, 92, 1, 42-49, 2016/06, SCI
  • "Exact algorithms for single-machine scheduling problems with a variable maintenance", Computers & Industrial Engineering, 98, 1, 427-433, 2016/05, SCI
  • "Minimizing makespan for solving the distributed no-wait flowshop scheduling problem", Computers & Industrial Engineering, 99, 1, 202-209, 2016/05, SCI
  • "Optimization of makespan for no-wait flowshop scheduling problems using efficient matheuristics", OMEGA-International Journal of Management Science, 64, 1, 115-125, 2016/04, SCI
  • "Multi-objective unrelated parallel machine scheduling: a Tabu-enhanced iterated Pareto greedy algorithm", International Journal of Production Research, 54, 4, 1110-1121, 2016/03, SCI
  • "Using the Integration of Discrete Event and Agent-Based Simulation to Enhance Outpatient Service Quality in an Orthopedic Department", Journal of Healthcare Engineering, 2016, 1, 1-8, 2016/03, SCI
  • "Real-time relief distribution in the aftermath of aisasters – A rolling horizon approach", Transportation Research Part E: Logistics and Transport Review, 93, 1, 1-20, 2016/03, SCI
  • "Scheduling the two-machine flowshop to hedge against processing time uncertainty", Journal of the Operational Research Society, 66, 9, 1413-1425, 2015/09, SSCI
  • "A multi-point simulated annealing heuristic for solving multiple-objective unrelated parallel machine scheduling problem", International Journal of Production Research, 53, 4, 1065-1076, 2015/04, SCI
  • "Order acceptance and scheduling to maximize total net revenue in permutation flowshops with weighted tardiness", Applied Soft Computing, 32, 2, 462-474, 2015/04, SCI
  • "Minimizing the total service time of discrete dynamic berth allocation problem by an iterated greedy heuristic", The Scientific World Journal, 12, 2014/10, SCI
  • "Robust single machine scheduling for minimizing total flow time in the presence of uncertain processing times", Computer and Industrial Engineering, 74, 1, 102-110, 2014/07, SCI
  • "Minimizing worst-case regret of makespan on a single machine with uncertain processing and setup times", Applied Soft Computing, 23, 1, 144-151, 2014/06, SCI
  • "A multi-point simulated annealing heuristic for solving multiple-objective unrelated parallel machine scheduling problem", International Journal of Production Research, 53, 4, 1065+1076, 2014/03, SCI
  • "Bi-objective reentrant hybrid flowshop scheduling: An iterated Pareto greedy algorithm", International Journal of Production Research, 52, 19, 5735-5747, 2014/03, SCI
  • "ABC-based manufacturing scheduling for unrelated parallel machines with machine-dependent and job sequence-dependent setup times", Computers & Operations Research, 51, 1, 172-181, 2014/02, SCI
  • "Minimizing shifts for personnel task scheduling problems: A three-phase algorithm", European Journal of Operational Research, 237, 1, 323-334, 2014/01, SCI
  • "Efficient wafer sorting scheduling using a hybrid artificial immune system", Journal of the Operational Research Society, 65, 1, 169-179, 2014/01, SCI
  • "A high performing constructive heuristic for minimizing makespan in permutation flowshops", Journal of Industrial and Production Engineering, 30, 6, 355-362, 2013/12, TSSCI
  • "A high-performing constructive heuristic for minimizing makespan in permutation flowshops", Journal of Industrial and Production Engineering, 30, 6, 355-362, 2013/12, SCI
  • "Minimising makespan in distributed permutation flowshops using a modified iterated greedy algorithm", International Journal of Production Research, 51, 16, 5029-5038, 2013/08, SCI
  • "Minimizing makespan and total flowtime in permutation flowshops by a bi-objective multi-start simulated-annealing algorithm", Computers and Operations Research, 40, 6, 1625-1647, 2013/06, SCI
  • "Multiprocessor task scheduling in multistage hybrid flowshops: A hybrid artificial bee colony algorithm with bi-directional planning", Computers and Operations Research, 40, 5, 1186-1195, 2013/05, SCI
  • "Minimizing makespan in a blocking flowshop using a revised artificial immune system algorithm", OMEGA-International Journal of Management Science, 41, 2, 383-389, 2013/04, SCI
  • "Increasing the total net revenue for single machine order acceptance and scheduling problems using an artificial bee colony algorithm", Journal of the Operational Research Society, 64, 2, 293-311, 2013/02, SCI
  • "Makespan minimization for scheduling unrelated parallel machines with setup times", Journal of Intelligent Manufacturing, 23, 5, 1795-1803, 2012/10, SCI
  • "Scheduling identical wafer sorting parallel machines with sequence-dependent setup times using an iterated greedy heuristic", International Journal of Production Research, 50, 10, 2710-2719, 2012/07, SCI
  • "An intelligent algorithm with feature selection and decision rules applied to anomaly intrusion detection", Applied Soft Computing, 12, 10, 3285-3290, 2012/06, SCI
  • "Robust scheduling on a single machine to minimize total flow time", Computers and Operations Research, 39, 7, 1682-1691, 2012/05, SCI
  • "Minimizing total flow time in permutation flowshop environment", International Journal of Innovational Computing, Information and Control, 8, 8, 1-11, 2012/05, SCI
  • "Scheduling a bi-criteria flowshop manufacturing cell with sequence- dependent family setup times", European Journal of Industrial Engineering, 6, 4, 474-496, 2012/05, SCI
  • "Minimising makespan for multistage hybrid flowshop scheduling problems with multiprocessor tasks by a hybrid immune algorithm", European Journal of Industrial Engineering, 6, 2, 199-215, 2012/04, SCI
  • "Sn-Cu-Ni soldering process optimization using multivariate Analysis", IEEE Transactions on Components, Packaging and Manufacturing Technology, 2, 3, 527-535, 2012/04, SCI
  • "Metaheuristics for scheduling a no-wait flowshop manufacturing cell with sequence dependent family setups", International Journal of Advanced Manufacturing Technology, 58, 5, 671-682, 2012/03, SCI
  • "Unrelated parallel machines scheduling with sequence- and machine-dependent setup times and due date constraints", International Journal of Innovational Computing, Information and Control, 8, 5, 3279-3297, 2012/02, SCI
  • "Service science: the trend and the future core", Journal of the Chinese Institute of Industrial Engineers, 28, 1-2, 2011/03, EI
  • "Minimization of maximum lateness on parallel machines with sequence-dependent setup times and job release dates", Computers and Operations Research, 38, 809-815, 2011/02, SCI
  • "Cell formation using a simulated annealing algorithm with variable neighbourhood", European Journal of Industrial Engineering, 5, 22-42, 2011/02, SCI
  • "Meta-heuristic algorithms for wafer sorting scheduling problems", Journal of the Operational Research Society, 62, 165-174, 2011/01, SCI
  • "Minimization of total tardiness on unrelated parallel machines with sequence- and machine-dependent setup times under due date constraints", International Journal of Advanced Manufacturing Technology, 53, 353-361, 2011/01, SCI
  • "Part-machine cell formation in group technology using a simulated annealing-based meta-heuristic", International Journal of Production Research, 48, 3579-3591, 2010/05, SCI
  • "Applying PSO-based BPN to predict the yield rate of DRAM modules produced by defective ICs", International Journal of Advanced Manufacturing Technology, 49, 987-999, 2010/04, SCI
  • "Scheduling jobs on dynamic parallel machines with sequence-dependent setup times", International Journal of Advanced Manufacturing Technology, 47, 773-781, 2010/03, SCI
  • "Permutation and non-permutation schedules for the flowline manufacturing cell with sequence dependent family setups", International Journal of Production Research, 48, 2169-2184, 2010/02, SCI
  • "An enhanced ant colony optimization (EACO) applied to capacitated vehicle routing problem", Applied Intelligence, 32, 88-95, 2010/02, SCI
  • "Dynamic parallel machine scheduling with sequence-dependent setup times using an iterated greedy heuristic", Expert Systems with Applications, 37, 2848-2852, 2010/01, SCI
  • "An ensemble approach applied to classify spam E-mails", Expert Systems with Applications, 37, 2197-2201, 2010/01, SCI
  • "Scheduling multistage hybrid flowshops with multiprocessor tasks by an effective heuristic", International Journal of Production Research, 47, 13, 3525-3538, 2009/07, SCI
  • "The causality of hourly price-volume relationship: An empirical study of mini Taiwan exchange futures", Expert Systems with Applications, 36, 4896-4899, 2009/06, SCI
  • "An iterated greedy heuristic for multistage hybrid flowshop scheduling problems with multiprocessor tasks", Journal of the Operational Research Society, 60, 810-817, 2009/05, SCI
  • "Using simulated annealing to scheduling a flowshop manufacturing cell with sequence dependent family setup times", International Journal of Production Research, 47, 12, 3205-3217, 2009/04, SCI&EI
  • "Hybrid-directional planning: improving improvement heuristics for scheduling resource-constrained projects", International Journal of Advanced Manufacturing Technology, 41, 3, 358-366, 2009/03, SCI&EI
  • "Metaheuristics for scheduling a non-permutation flowline manufacturing cell with sequence dependent family setup times", Computers and Operations Research, 36, 1110-1121, 2009/02, SCI&EI
  • "Testing the significance of solar term effect in the Taiwan stock market", Expert Systems with Applications, 36, 6140-6144, 2009/02, SCI&EI
  • "Sequencing single-machine tardiness problems with sequence dependent setup times using an iterated greedy heuristic", Expert Systems with Applications, 36, 7087-7092, 2009/02, SCI&EI
  • "Applying hybrid meta-heuristics for capacitated vehicle routing problems", Expert Systems with Applications, 36, 1505-1512, 2009/01, SCI&EI
  • "Applying a hybrid simulated annealing and tabu search approach to non-permutation flowshop scheduling problems", International Journal of Production Research, 5, 1411-1424, 2009/01, SCI&EI
  • "Raising the hit rate for wafer fabrication by a simple constructive heuristic", Expert Systems with Applications, 36, 2894-2900, 2009/01, SCI&EI
  • "Particle swarm optimization for parameter determination and feature selection of support vector machines", Expert Systems with Applications, 35, 1817-1824, 2008/11, SCI&EI
  • "An intelligent system based on analytic hierarchy process and fuzzy logic applied to evaluate the software quality of Smartphone", Far East Journal of Experimental and Theoretical Artificial Intelligence, 1, 71-86, 2008/11, ELSE2
  • "Minimizing earliness-tardiness penalties for common due date single-machine scheduling problems by a recovering beam search algorithm", Computers and Industrial Engineering, 55, 494-502, 2008/11, SCI&EI
  • "A hybrid approach for single-machine tardiness problems with sequence-dependent setup times", Journal of the Operational Research Society, 59, 1109-1119, 2008/10, SSCI
  • "Solving non-permutation flowshop scheduling problems by an effective iterated greedy heuristic", International Journal of Advanced Manufacturing Technology, 38, 3-4, 348-354, 2008/08, SCI&EI
  • "Solving single machine total weighted tardiness problems with sequence-dependent setup times by meta-heuristics", International Journal of Advanced Manufacturing Technology, 34, 11-12, 1183-1190, 2007/11, SCI&EI
  • "An intelligent algorithm for scheduling jobs on a single machine with a common due date", Lecture Notes in Computer Science, 4693, 689-695, 2007/10, SCI&EI
  • "Multi-heuristic desirability ant colony system heuristic for non-permutation flowshop scheduling problems", International Journal of Advanced Manufacturing Technology, 33, 7-8, 793-802, 2007/09, SCI&EI
  • "A dynamical ant colony optimization (DACO) with heuristics for scheduling jobs on a single machine with a common due date", Meta-heuristics for Scheduling in Emergent Computational Systems, Studies in Computational Intelligence, 128, 91-103, 2007/09, SCI
  • "A Sequential Exchange Approach for Minimizing Earliness-Tardiness Penalties of Single-Machine Scheduling with a Common Due Date", European Journal of Operational Research, 177, 2, 1294-1301, 2007/03, SCI&EI
  • "無鉛環保銲料鋼板印刷製程參數優化", 技術學刊, 21, 3, 227-236, 2006/09, ELSE1
  • "Multiprocessor task scheduling in multistage hybrid flow-shops an ant colony system approach", International Journal of Production Research, 44, 16, 3161-3177, 2006/08, SCI&EI
  • "An ant colony system for permutation flow-shop sequencing", Computers and Operations Research, 31, 5, 791-801, 2004/04, SCI&EI
  • "An ant colony system approach for scheduling problem", Production Planning & Control, 14, 1, 68-75, 2003/10, SCI&EI

研討會論文

  • "單機排程研究之主路徑分析", 單機排程研究之主路徑分析, 金門縣, 2022/11/11
  • "Enhancing Service Quality of New Draftees’ Physical Examination Using the Hybrid Simulation", Asia Pacific Industrial Engineering & Management Systems Conference 2016, 臺北, 2016/12/07
  • "Optimal Allocation of Cashiers and Pharmacists in Large Hospitals: A Point-wise, Fluid-based Dynamic Queueing Network Approach", Asia Pacific Industrial Engineering & Management Systems Conference 2016, 臺北, 2016/12/07
  • "醫療器材之風險管理—以可調式金屬手杖為例", 2013生物醫學工程科技研討會, 新竹, 2013/11/15
  • "健康照護產品標準與檢測驗證技術推廣策略之評選", 第三屆健康促進、休閒運動與醫學保健學術研討會, 苗栗, 2011/03/23
  • "專業保險經理人逆境商數與工作績效之相關性", 2008服務創新與應用研討會, 台北, 2008/11/07
  • "工業電腦製造商之綠色供應商評選模式", 第三屆管理知識與技術提升學術研討會, 台北縣, 2008/05/31
  • "報價決策偏好對採購人員決策績效之影響", 第三屆管理知識與技術提升學術研討會, 台北縣, 2008/05/31
  • "Applying simulated annealing approach for capacitated vehicle routing problems", Proceedings of 2006 IEEE International Conference on system, Man and Cybernetics, Taipei, 2006/10/08
  • "Vehicle routing problems with time windows using simulated annealing", Proceedings of 2006 IEEE International Conference on system, Man and Cybernetics, Taipei, 2006/10/08
  • "建構醫院緊急事件應變指揮系統之成功因素", 健康與管理學術研討會, 新竹, 2006/06/24
  • "國民小學校務行政之知識管理", 第二屆管理知識與技術提升學術研討會., 台北縣, 2006/05/27
  • "ISO 9001與內部控制制度之系統整合", 第二屆管理知識與技術提升學術研討會., 台北縣, 2006/05/27
  • "潛水設備廠之S-DBR與MRP整合模式", 第二屆管理知識與技術提升學術研討會, 台北縣, 2006/05/27
  • "Success factors of establishing the hospital emergency incident command system", 2006 International Hospital Federation Asian Pacific Regional Conference, Taipei, 2006/04/02
  • "以灰色分析階層程序法評選醫院建構HEICS之成功因素", 中國工業工程學會94年度年會暨學術研討會, 新竹, 2005/12/17
  • "四念處於破壞性情緒管理之初探", 第六屆禪與管理研討會, 台北縣, 2005/05/07

相關證照

  • Certified Trainer of Level C General Project Manager, Armenian Project Management Association
  • Certified Trainer of Level A Complex Project Manager, American Project Management Association
  • IPMA Level D, Certified Trainer, 台灣專案管理學會
  • Certified Trainer of Level A+ Program Manager, American Project Management Association
  • Certified Trainer of Level B R&D Project Manager, American Project Management Association
回頁首