"Adjusted Iterative Greedy for the Optimization of Additive Manufacturing Scheduling Problems", Expert Systems with Applications, 198, 116908, 1-9, 2022/07, SCI
"Artificial intelligence in the Construction Industry: Main Development Trajectories and Future Outlook", Applied Sciences, 12, 5832, 1-19, 2022/06, SCI
"Single machine scheduling problems with sequence-dependent setup times and precedence delays", Scientific Reports, 12, 9430, 1-12, 2022/06, SCI
"Minimizing total completion time in no-wait jobshops using a backtracking multi-start simulated annealing algorithm", Computers & Industrial Engineering, 169, 108238, 1-12, 2022/05, SCI
"Meta-Lamarckian-based Iterated Greedy for Optimizing Distributed Two-stage Assembly Flowshops with Mixed-Setups", Annals of Operations Research, 2022, 045372, 1-22, 2022/02, SCI
"New benchmark algorithm for hybrid flowshop scheduling with identical machines", Expert Systems with Applications, 183, No. 115422, 2021/11, SCI
"Supply chain-oriented two-stage assembly flowshops with sequence-dependent setup times", Journal of Manufacturing Systems, 61, 139-154, 2021/10, SCI
"Deep learning-based optimization for motion planning of dual-arm assembly robots corresponding", Computers & Industrial Engineering, 160, No. 107603, 2021/08, SCI
"An auction bidding approach to balance performance bonuses in vehicle routing problems with time windows", Sustainability, 13, No. 9430, 2021/08, SCI
"New benchmark algorithms for no-wait flowshop group scheduling problem with sequence-dependent setup times", Applied Soft Computing, 111, No. 107705, 2021/07, SCI
"Minimizing makespan in job-shops with deterministic machine availability constraints", International Journal of Production Research, 59, 14, 4403-4415, 2021/07, SCI
"No-idle Flowshop Scheduling for Energy-Efficient Production: An Improved Optimization Framework", Mathematics, 9, 1335, 2021/06, SCI
"Multiple temperature simulated annealing for optimizing mixed-blocking permutation flowshop scheduling problems", Expert Systems with Applications, 165, No.113837, 2021/03, SCI
"New benchmark algorithm for minimizing total completion time in blocking flowshops with sequence-dependent setup times", Applied Soft Computing, 104, No. 107229, 2021/03, SCI
"Cyber-physical assembly system-based optimization for robotic assembly sequence plannings", Journal of Manufacturing Systems, 58, 452-466, 2021/02, SCI
"Maximizing cohesion and separation for detecting protein functional modules in protein-protein interaction networks", PLoS ONE, 15, 10, e0240628, 2020/10, SCI
"Solving no-wait job-shop scheduling problems using a multi-start simulated annealing with bi-directional shift timetabling algorithm", Computers & Industrial Engineering, 146, 8, 106615, 2020/08, SCI
"Minimizing total completion time in mixed blocking permutation flowshops", IEEE Access, 8, 1, 142065–142075, 2020/08, SCI
"Greedy-based Non-dominated Sorting Genetic Algorithm III for Optimizing Single-machine Scheduling Problem with Interfering Jobs", IEEE Access, 8, 1, 142543–142556, 2020/08, SCI
"Improved beam search for optimizing no-wait flowshops with release times", IEEE Access, 8, 1, 148100–148124, 2020/08, SCI
"Learning-based metaheuristic for scheduling unrelated parallel machines with uncertain setup times", IEEE Access, 8, 1, 74065–74082, 2020/05, SCI
"The appropriateness of machines to products by production efficiency view: A case study in the forging industry", Journal of Innovation and Business Management, 8, 1, 45-60, 2019/11, ELSE1
"Single machine job sequencing with a restricted common due window", IEEE Access, 7, 1, 148741-148755, 2019/10, SCI
"Comparative analysis of mixed integer programming formulations for single-machine and parallel-machine scheduling problems", IEEE Access, 7, 1, 152998-153011, 2019/10, SCI
"Scheduling jobs of two competing agents on a single machine", IEEE Access, 7, 1, 98702-98714, 2019/07, SCI
"Intelligent parametric design for a multiple-quality-characteristic glue-dispensing process", Journal of Intelligent Manufacturing, 30, 5, 2291-2305, 2019/06, SCI
"Makespan optimization in a no-wait flowline manufacturing cell with sequence-dependent family setup times", Computers & Industrial Engineering, 128, 1, 1-7, 2019/02, SCI
"Solving the mask data preparation scheduling problem using meta-heuristics", IEEE Access, 7, 1, 24192-24203, 2019/02, SCI
"Minimizing makespan in mixed no-wait flowshops with sequence-dependent setup times", Computers & Industrial Engineering, 130, 1, 338-347, 2019/02, SCI
"Minimizing makespan in distributed mixed no-idle flowshops", International Journal of Production Research, 57, 1, 48-60, 2019/01, SCI
"Minimizing the sum of makespan and total weighted tardiness in a no-wait flowshop", IEEE Access, 6, 1, 78666-78677, 2018/12, SCI
"Minimizing makespan for no-wait flowshop scheduling problems with setup times", Computers & Industrial Engineering, 121, 5, 73-81, 2018/05, SCI
"Improved exact methods for solving no-wait flowshop scheduling problems with due date constraints", IEEE Access, 6, 1, 30702-30713, 2018/05, SCI
"Optimization algorithms for proportionate flowshop scheduling problems with variable maintenance activities", Computers & Industrial Engineering, 117, 3, 164-170, 2018/03, SCI
"Decreasing the system testing makespan in a computer manufacturing company,", IEEE Access, 6, 1, 16464-16473, 2018/03, SCI
"Minimizing makespan for the distributed hybrid flowshop scheduling problem with multiprocessor tasks", Expert Systems with Applications, 92, 1, 132-141, 2018/02, SCI
"Combining Discrete Event and Agent-Based Simulation for Reducing Draftees' Waiting Time in Physical Examination Centers", International Journal of Industrial Engineering: Theory, Applications And Practice, 25, 2, 175-185, 2018/02, SCI
"Optimal Allocation of Cashiers and Pharmacists in Large Hospitals: A Point-wise Fluid-based Dynamic Queueing Network Approach", IEEE Access, 6, December, 2859-2870, 2017/12, SCI
"Minimizing makespan in distributed blocking flowshops using hybrid iterated greedy algorithms", IEEE Access, 5, August, 15694-15705, 2017/12, SCI
"An advanced iterated greedy algorithm for minimizing makespan in blocking flowshops", SYLWAN, 161, 8, 91-104, 2017/11, SCI
"Applying strain gauges to measuring thermal warpage of printed circuit boards", Measurement, 110, 2, 239-248, 2017/10, SCI
"Uniform parallel-machine scheduling for minimizing total resource consumption with a bounded makespan", IEEE Access, 5, August, 15791-15799, 2017/10, SCI
"Single-machine scheduling with learning effects and maintenance: a methodological note on some polynomial-time solvable cases", Mathematical Problems in Engineering, 2017, 1-6, 2017/09, SCI
"Minimizing total cost for training and assigning multi-skilled workers in seru production systems", International Journal of Production Research, 55, 10, 2978-2989, 2017/06, SCI
"Effective dynamic dispatching rule and constructive heuristic for solving single-machine scheduling problems with a common due window", International Journal of Production Research, 55, 6, 1707-1719, 2017/03, SCI
"Self-adaptive ruin-and-recreate algorithm for minimizing total flow time in no-wait flowshops", Computers & Industrial Engineering, 101, 1, 167-176, 2016/08, SCI
"Minimizing total weighted earliness and tardiness penalties on identical parallel machines using a fast ruin-and-recreate algorithm", International Journal of Production Research, 54, 22, 6879-6890, 2016/06, SCI
"Dynamic parametric design and feasibility assessment for a high resistance measuring system", Measurement, 92, 1, 42-49, 2016/06, SCI
"Exact algorithms for single-machine scheduling problems with a variable maintenance", Computers & Industrial Engineering, 98, 1, 427-433, 2016/05, SCI
"Minimizing makespan for solving the distributed no-wait flowshop scheduling problem", Computers & Industrial Engineering, 99, 1, 202-209, 2016/05, SCI
"Optimization of makespan for no-wait flowshop scheduling problems using efficient matheuristics", OMEGA-International Journal of Management Science, 64, 1, 115-125, 2016/04, SCI
"Multi-objective unrelated parallel machine scheduling: a Tabu-enhanced iterated Pareto greedy algorithm", International Journal of Production Research, 54, 4, 1110-1121, 2016/03, SCI
"Using the Integration of Discrete Event and Agent-Based Simulation to Enhance Outpatient Service Quality in an Orthopedic Department", Journal of Healthcare Engineering, 2016, 1, 1-8, 2016/03, SCI
"Real-time relief distribution in the aftermath of aisasters – A rolling horizon approach", Transportation Research Part E: Logistics and Transport Review, 93, 1, 1-20, 2016/03, SCI
"Scheduling the two-machine flowshop to hedge against processing time uncertainty", Journal of the Operational Research Society, 66, 9, 1413-1425, 2015/09, SSCI
"Order acceptance and scheduling to maximize total net revenue in permutation flowshops with weighted tardiness", Applied Soft Computing, 32, 2, 462-474, 2015/04, SCI
"A multi-point simulated annealing heuristic for solving multiple-objective unrelated parallel machine scheduling problem", International Journal of Production Research, 53, 4, 1065-1076, 2015/04, SCI
"Minimizing the total service time of discrete dynamic berth allocation problem by an iterated greedy heuristic", The Scientific World Journal, 12, 2014/10, SCI
"Robust single machine scheduling for minimizing total flow time in the presence of uncertain processing times", Computer and Industrial Engineering, 74, 1, 102-110, 2014/07, SCI
"Minimizing worst-case regret of makespan on a single machine with uncertain processing and setup times", Applied Soft Computing, 23, 1, 144-151, 2014/06, SCI
"Bi-objective reentrant hybrid flowshop scheduling: An iterated Pareto greedy algorithm", International Journal of Production Research, 52, 19, 5735-5747, 2014/03, SCI
"A multi-point simulated annealing heuristic for solving multiple-objective unrelated parallel machine scheduling problem", International Journal of Production Research, 53, 4, 1065+1076, 2014/03, SCI
"ABC-based manufacturing scheduling for unrelated parallel machines with machine-dependent and job sequence-dependent setup times", Computers & Operations Research, 51, 1, 172-181, 2014/02, SCI
"Efficient wafer sorting scheduling using a hybrid artificial immune system", Journal of the Operational Research Society, 65, 1, 169-179, 2014/01, SCI
"Minimizing shifts for personnel task scheduling problems: A three-phase algorithm", European Journal of Operational Research, 237, 1, 323-334, 2014/01, SCI
"A high performing constructive heuristic for minimizing makespan in permutation flowshops", Journal of Industrial and Production Engineering, 30, 6, 355-362, 2013/12, TSSCI
"A high-performing constructive heuristic for minimizing makespan in permutation flowshops", Journal of Industrial and Production Engineering, 30, 6, 355-362, 2013/12, SCI
"Minimising makespan in distributed permutation flowshops using a modified iterated greedy algorithm", International Journal of Production Research, 51, 16, 5029-5038, 2013/08, SCI
"Minimizing makespan and total flowtime in permutation flowshops by a bi-objective multi-start simulated-annealing algorithm", Computers and Operations Research, 40, 6, 1625-1647, 2013/06, SCI
"Multiprocessor task scheduling in multistage hybrid flowshops: A hybrid artificial bee colony algorithm with bi-directional planning", Computers and Operations Research, 40, 5, 1186-1195, 2013/05, SCI
"Minimizing makespan in a blocking flowshop using a revised artificial immune system algorithm", OMEGA-International Journal of Management Science, 41, 2, 383-389, 2013/04, SCI
"Increasing the total net revenue for single machine order acceptance and scheduling problems using an artificial bee colony algorithm", Journal of the Operational Research Society, 64, 2, 293-311, 2013/02, SCI
"Makespan minimization for scheduling unrelated parallel machines with setup times", Journal of Intelligent Manufacturing, 23, 5, 1795-1803, 2012/10, SCI
"Scheduling identical wafer sorting parallel machines with sequence-dependent setup times using an iterated greedy heuristic", International Journal of Production Research, 50, 10, 2710-2719, 2012/07, SCI
"An intelligent algorithm with feature selection and decision rules applied to anomaly intrusion detection", Applied Soft Computing, 12, 10, 3285-3290, 2012/06, SCI
"Robust scheduling on a single machine to minimize total flow time", Computers and Operations Research, 39, 7, 1682-1691, 2012/05, SCI
"Minimizing total flow time in permutation flowshop environment", International Journal of Innovational Computing, Information and Control, 8, 8, 1-11, 2012/05, SCI
"Scheduling a bi-criteria flowshop manufacturing cell with sequence- dependent family setup times", European Journal of Industrial Engineering, 6, 4, 474-496, 2012/05, SCI
"Minimising makespan for multistage hybrid flowshop scheduling problems with multiprocessor tasks by a hybrid immune algorithm", European Journal of Industrial Engineering, 6, 2, 199-215, 2012/04, SCI
"Sn-Cu-Ni soldering process optimization using multivariate Analysis", IEEE Transactions on Components, Packaging and Manufacturing Technology, 2, 3, 527-535, 2012/04, SCI
"Metaheuristics for scheduling a no-wait flowshop manufacturing cell with sequence dependent family setups", International Journal of Advanced Manufacturing Technology, 58, 5, 671-682, 2012/03, SCI
"Unrelated parallel machines scheduling with sequence- and machine-dependent setup times and due date constraints", International Journal of Innovational Computing, Information and Control, 8, 5, 3279-3297, 2012/02, SCI
"Service science: the trend and the future core", Journal of the Chinese Institute of Industrial Engineers, 28, 1-2, 2011/03, EI
"Minimization of maximum lateness on parallel machines with sequence-dependent setup times and job release dates", Computers and Operations Research, 38, 809-815, 2011/02, SCI
"Cell formation using a simulated annealing algorithm with variable neighbourhood", European Journal of Industrial Engineering, 5, 22-42, 2011/02, SCI
"Minimization of total tardiness on unrelated parallel machines with sequence- and machine-dependent setup times under due date constraints", International Journal of Advanced Manufacturing Technology, 53, 353-361, 2011/01, SCI
"Meta-heuristic algorithms for wafer sorting scheduling problems", Journal of the Operational Research Society, 62, 165-174, 2011/01, SCI
"Part-machine cell formation in group technology using a simulated annealing-based meta-heuristic", International Journal of Production Research, 48, 3579-3591, 2010/05, SCI
"Applying PSO-based BPN to predict the yield rate of DRAM modules produced by defective ICs", International Journal of Advanced Manufacturing Technology, 49, 987-999, 2010/04, SCI
"Scheduling jobs on dynamic parallel machines with sequence-dependent setup times", International Journal of Advanced Manufacturing Technology, 47, 773-781, 2010/03, SCI
"Permutation and non-permutation schedules for the flowline manufacturing cell with sequence dependent family setups", International Journal of Production Research, 48, 2169-2184, 2010/02, SCI
"An enhanced ant colony optimization (EACO) applied to capacitated vehicle routing problem", Applied Intelligence, 32, 88-95, 2010/02, SCI
"Dynamic parallel machine scheduling with sequence-dependent setup times using an iterated greedy heuristic", Expert Systems with Applications, 37, 2848-2852, 2010/01, SCI
"An ensemble approach applied to classify spam E-mails", Expert Systems with Applications, 37, 2197-2201, 2010/01, SCI
"Scheduling multistage hybrid flowshops with multiprocessor tasks by an effective heuristic", International Journal of Production Research, 47, 13, 3525-3538, 2009/07, SCI
"The causality of hourly price-volume relationship: An empirical study of mini Taiwan exchange futures", Expert Systems with Applications, 36, 4896-4899, 2009/06, SCI
"An iterated greedy heuristic for multistage hybrid flowshop scheduling problems with multiprocessor tasks", Journal of the Operational Research Society, 60, 810-817, 2009/05, SCI
"Using simulated annealing to scheduling a flowshop manufacturing cell with sequence dependent family setup times", International Journal of Production Research, 47, 12, 3205-3217, 2009/04, SCI&EI
"Hybrid-directional planning: improving improvement heuristics for scheduling resource-constrained projects", International Journal of Advanced Manufacturing Technology, 41, 3, 358-366, 2009/03, SCI&EI
"Metaheuristics for scheduling a non-permutation flowline manufacturing cell with sequence dependent family setup times", Computers and Operations Research, 36, 1110-1121, 2009/02, SCI&EI
"Testing the significance of solar term effect in the Taiwan stock market", Expert Systems with Applications, 36, 6140-6144, 2009/02, SCI&EI
"Sequencing single-machine tardiness problems with sequence dependent setup times using an iterated greedy heuristic", Expert Systems with Applications, 36, 7087-7092, 2009/02, SCI&EI
"Applying hybrid meta-heuristics for capacitated vehicle routing problems", Expert Systems with Applications, 36, 1505-1512, 2009/01, SCI&EI
"Applying a hybrid simulated annealing and tabu search approach to non-permutation flowshop scheduling problems", International Journal of Production Research, 5, 1411-1424, 2009/01, SCI&EI
"Raising the hit rate for wafer fabrication by a simple constructive heuristic", Expert Systems with Applications, 36, 2894-2900, 2009/01, SCI&EI
"Particle swarm optimization for parameter determination and feature selection of support vector machines", Expert Systems with Applications, 35, 1817-1824, 2008/11, SCI&EI
"An intelligent system based on analytic hierarchy process and fuzzy logic applied to evaluate the software quality of Smartphone", Far East Journal of Experimental and Theoretical Artificial Intelligence, 1, 71-86, 2008/11, ELSE2
"Minimizing earliness-tardiness penalties for common due date single-machine scheduling problems by a recovering beam search algorithm", Computers and Industrial Engineering, 55, 494-502, 2008/11, SCI&EI
"A hybrid approach for single-machine tardiness problems with sequence-dependent setup times", Journal of the Operational Research Society, 59, 1109-1119, 2008/10, SSCI
"Solving non-permutation flowshop scheduling problems by an effective iterated greedy heuristic", International Journal of Advanced Manufacturing Technology, 38, 3-4, 348-354, 2008/08, SCI&EI
"Solving single machine total weighted tardiness problems with sequence-dependent setup times by meta-heuristics", International Journal of Advanced Manufacturing Technology, 34, 11-12, 1183-1190, 2007/11, SCI&EI
"An intelligent algorithm for scheduling jobs on a single machine with a common due date", Lecture Notes in Computer Science, 4693, 689-695, 2007/10, SCI&EI
"Multi-heuristic desirability ant colony system heuristic for non-permutation flowshop scheduling problems", International Journal of Advanced Manufacturing Technology, 33, 7-8, 793-802, 2007/09, SCI&EI
"A dynamical ant colony optimization (DACO) with heuristics for scheduling jobs on a single machine with a common due date", Meta-heuristics for Scheduling in Emergent Computational Systems, Studies in Computational Intelligence, 128, 91-103, 2007/09, SCI
"A Sequential Exchange Approach for Minimizing Earliness-Tardiness Penalties of Single-Machine Scheduling with a Common Due Date", European Journal of Operational Research, 177, 2, 1294-1301, 2007/03, SCI&EI
"Multiprocessor task scheduling in multistage hybrid flow-shops an ant colony system approach", International Journal of Production Research, 44, 16, 3161-3177, 2006/08, SCI&EI
"An ant colony system for permutation flow-shop sequencing", Computers and Operations Research, 31, 5, 791-801, 2004/04, SCI&EI
"An ant colony system approach for scheduling problem", Production Planning & Control, 14, 1, 68-75, 2003/10, SCI&EI
研討會論文
"單機排程研究之主路徑分析", 單機排程研究之主路徑分析, 金門縣, 2022/11/11
"Enhancing Service Quality of New Draftees’ Physical Examination Using the Hybrid Simulation", Asia Pacific Industrial Engineering & Management Systems Conference 2016, 臺北, 2016/12/07
"Optimal Allocation of Cashiers and Pharmacists in Large Hospitals: A Point-wise, Fluid-based Dynamic Queueing Network Approach", Asia Pacific Industrial Engineering & Management Systems Conference 2016, 臺北, 2016/12/07
"Applying simulated annealing approach for capacitated vehicle routing problems", Proceedings of 2006 IEEE International Conference on system, Man and Cybernetics, Taipei, 2006/10/08
"Vehicle routing problems with time windows using simulated annealing", Proceedings of 2006 IEEE International Conference on system, Man and Cybernetics, Taipei, 2006/10/08
"Success factors of establishing the hospital emergency incident command system", 2006 International Hospital Federation Asian Pacific Regional Conference, Taipei, 2006/04/02